The last few days of house building have found us making choices about things that we thought had been done. The house building process is very interesting.
The "tile master" as I will call him is excellent! He is really nice as well as being super at his craft. When we got to the house this afternoon, we found the master bath door blocked as he had been grouting and wanted us to stay off.
I was able to take pictures!
|
The red dining room ceiling will get another coat!
We love how it is looking!! |
|
Nothing has been cleaned off yet, so it should look more vibrant
when it is. |
|
We love the way the decorative piece is around
the tub front.
The knee
wall will have glass above it.
|
|
The stacked stone for the front of the house and the
downstair's fireplace which is floor to ceiling is a little richer
than my picture portrays.
guest bath on the main floor
The granite for this vanity is amazing. The sinks were sent to the granite fabricator, so
maybe we will have some counter tops soon.
The kitchen cabinets are in the making, we think. They will take about three weeks. Once they are in the granite man, Tim, will measure and fix the kitchen counter tops.
|