We did not get up to the house for 3 days or so and things had changed a good deal.
The trim carpenters had been busy.
|
The deck for the master bath tub. |
|
The columns look different now. They should look great painted.
|
|
The bottom cabinets will have doors on them. We decided to have them painted rather than stained.
|
|
The wet bar cabinets in the lower level. It was not quite how we imagined it, so we have a meeting tomorrow with the trim carpenter and the project manager.
|
|
Steve is checking out the linen closet in our master bath. The vanities have been started.
|
|
The yard is still a work in progress!! Lots and lots of dirt have been moved!!! |
|
The patio area at the lower level doors.
It has turned out larger that we thought and ought to make a nice area for a hot tub, eventually??? The small overhang over the doors has got to be redone because it is supposed to be larger. |
|
This retaining wall will be continued and turned. It will step down in height. We think that it will make a great patio area on the side of the house where the lower level doors are.
|