Sunday, November 20, 2011

More House

We did not get up to the house for 3 days or so and things had changed a good deal.

 The trim carpenters had been busy.  
The deck for the master bath tub.

The columns look  different now.  They should look great painted.


The bottom cabinets will have doors on them.  We decided to have them painted rather than stained.








The wet bar cabinets in the lower level.  It was not quite how we imagined it, so we have a meeting tomorrow with the trim carpenter and the project manager.



Steve is checking out the linen closet in our master bath.  The vanities have been started.


The yard is still a work in progress!!  Lots and lots of dirt have been moved!!!

The patio area at the lower level doors.
It has turned out larger that we thought and ought to make a nice area for a hot tub, eventually???  The small overhang over the doors has got to be redone because it is supposed to be larger.

This retaining wall will be continued and turned.  It will step down in height.  We think that it will make a great patio area on the side of the house where the lower level doors are.