Monday, November 7, 2011

Our House


The house is coming along slowly but surely.  Today the crown molding was put in the lower level.  Maybe tomorrow they will begin the main level.  Yesterday Jackie and Mike came to see it and then Kaye & Chris drove up and got a tour.  Ben was over working in the yard today, so he rode up with us this evening to take a look.

The hardwoods are in now.
Steve is checkng the floors in our master bedroom.



                                                                Hardwoods in the greatroom


Doors are in now.  Today the crown molding and the baseboards had all been done in the lower level.
Doors out to the screened porch or into the great room from the screened porch.  Whichever way you choose to view it!

They will do a rough grade on the yard soon.  The septic system still has to be put in too, as well as the propane tank and lines.  By the time Josh gets home for Christmas all the inside stuff should just about be finished, so he will get to see it.

No comments:

Post a Comment